Jumeirah Bilgah Beach Hotel

Jumeirah Bilgah Beach Hotel

Bakü-Azerbeycan

Project Details

Main Contractor Azinko Holding
Employer Jumeriah
Project Scope ELECTRIC
Total Area 35000 m2
Start Date 2010
End Date 2012
Services Provided

Electrical Contracting

  • Medium Voltage Transformers and Switchgears (2x1600 kVA)
  • Generator Installation (3x 630 kVA Synchronous)
  • Low Voltage Distribution Boards and Distribution Cabling
  • Grounding and Lightning Protection Installations
  • Lighting Installation
  • Socket Installation
  • UPS Installation
  • Fire Detection and Warning System
  • CCTV System
  • IPTV and SMATV System
  • IP Phone System
  • Data and Network System
  • Hotel Rooms Automation System
  • MCC, DDC Boards and Installations
  • Environmental and Facade Lighting System
  • 14 Villa Electrical Installations
  • Aquapark Electrical Installations
  • Pier and Beach Bar-Restaurant Installations

Contact

  • Gayret District, Bankacılar Street, Marka Konutları Nr:3, A Block Nr:2
    Yenimahalle, Ankara

  • +90 312 387 30 03
  • +90 530 149 01 81
  • +90 312 387 30 02

  • info@yde.com.tr